{"id":698,"date":"2015-12-20T07:39:31","date_gmt":"2015-12-19T23:39:31","guid":{"rendered":"http:\/\/www.rapidprototypechina.com\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/"},"modified":"2015-12-20T07:40:38","modified_gmt":"2015-12-19T23:40:38","slug":"recommendations-for-rapid-prototype-iterative-development-life-cycle","status":"publish","type":"post","link":"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/","title":{"rendered":"Recommendations For Rapid Prototype Iterative Development Life Cycle"},"content":{"rendered":"<div style=\"float:leftmargin:5pxfont-size:80%\"><img decoding=\"async\" alt=\"rapid prototype prices\" src=\"http:\/\/www.rapidprototypechina.com\/blog\/wp-content\/uploads\/2015\/12\/15219992930_02a3fd7cb8_m.jpg\" width=\"160\" \/><br \/> by <a href=\"http:\/\/www.flickr.com\/photos\/91981316@N06\/15219992930\">clamshack<\/a><\/div>\n<p><strong> Suggestions For Speedy Prototype Iterative Improvement Life Cycle <\/strong><br \/>\n The rapid prototype iterative prototyping method, on the other hand, will facilitate functionally scoped, however totally deployable versions of the application to be delivered to users incrementally. Functionality is enhanced by means of new iterations until the final version is reduce out. Therefore, the program will be developed as executable software program elements in an evolving manner, every single iteration growing in functionality and in the end encompassing the requirements of the total production technique.<\/p>\n<p>Each and every iteration consists of 1 or far more of the following development cycle approach methods:<br \/>\nRequirements capture<br \/>\nAnalysis<br \/>\nDesign and style<br \/>\nImplementation<br \/>\nTesting<\/p>\n<p>Adjust is anticipated throughout all stages of the development. Technical risks are assessed and prioritised early in the life-cycle and are revised for every single iteration. The dangers linked with each and every iteration are alleviated with the profitable completion of the iteration.<\/p>\n<p>Iterative prototyping will guarantee fast prototype improvement, measurable progress and the ideal acceptability amongst users.<\/p>\n<p>Stage I &#8211; Beginning a Project and Analysing Needs<\/p>\n<p>Defining requirements for software program development is the duty of the client. Customer supplies the difficulty statement along with the organization requirement specification. Sometimes, the business specifications specification is generated through different interactions with the consumer.<\/p>\n<p>The project team would determine the functional phases in which the method will be developed and delivered. Functions within every single phase would stick to an iterative improvement approach.<\/p>\n<p>As a element of analysing needs, the project team might undertake visual modelling of the needs along with the logical grouping of scenarios and suggested options for implementation.<\/p>\n<p>This would typically incorporate:<\/p>\n<p>Use Case diagram(s) for the proposed system.<br \/>\nPreliminary Class Diagram displaying recommended new classes and other already existing classes.<\/p>\n<p>Evaluation of requirement scenarios and any other data required to give an overview of the company approach.<\/p>\n<p>Stage II &#8211; The Initial Iteration<\/p>\n<p>Scenarios of analysis are the primary inputs to this stage.<\/p>\n<p>The primary objective of the very first iteration would be to concentrate on the class diagram and figure out the data elements. This is aimed at addressing the database threat.<\/p>\n<p>Activities of this stage include:<br \/>\nConstructing the information model<br \/>\nDeploying the database<br \/>\nIdentifying the application and operations on classes. This will decide logical units of code that would be enhanced and re-used over iterations.<br \/>\nIdentification of a user interface that can address presentation troubles in relation to functionality.<br \/>\nPrototyping the design<br \/>\nPreliminary user documentation (operational directions)<\/p>\n<p>Either of the following two methods can be agreed upon for prototyping:<\/p>\n<p>Create a single prototype that aims at crystallizing the base functional elements without finer specifics of presentation.<\/p>\n<p>Develop several prototype alternatives with the same base functionality coverage for different presentation types. This could give users a far better feel of the final program. Also, presentation issues in relation to functionality typically get identified earlier rather than during the final stages of iteration.<\/p>\n<p>The strategy to be followed will be determined by feedback from the customer and the criticality of the presentation interface in relation to the enterprise approach as suggested by the requirement scenarios of Stage I.<\/p>\n<p>Stage III &#8211; Organizing the Iteration Method<\/p>\n<p>User feedback from the 1st iteration will enable the project group to plan subsequent iterations.<\/p>\n<p>Iterations would be planned primarily based on the following issues:<br \/>\nHighest risks are tackled first. This necessarily guarantees convergence towards preferred functionality as the project progresses through the iterations and also guarantees much less threat coupled with minimum investment.<\/p>\n<p>Figuring out the anticipated quantity of iterations ahead of the software can be shifted out of the iterative stage into final development. These are the intermediate iterations. The number of intermediate iterations would be determined by grouping scenarios (as defined in Stage I) to collectively provide a meaningful chunk of system functionality. For most projects, about 5 (plus or minus two) such intermediate iterations suffice.<\/p>\n<p>The iteration rolling into final improvement may possibly or may possibly not match presentation GUI needs of customers. This will depend on the strategy used in Stage II.<\/p>\n<p>The final development would be conducted as penultimate iterations(s). The concentrate of these iterations would be to incorporate finer information into the software, viz. presentation, error messages, print possibilities, multi-lingual help and so on. The maximum number of such penultimate iterations need to also be planned and defined &#8211; generally, two rounds would suffice.<\/p>\n<p>After the functionality has been crystallized, test organizing can be initiated.<\/p>\n<p>Concentrate of Iterations<\/p>\n<p>Focus of iterations would modify as functional depth is added to every iteration.<\/p>\n<p>The data model and application design and style should necessarily be validated and finalized in iteration II. Hence, class diagrams are finalized early in the iterative development cycle. At this time, it would also be possible to define the operations on classes.<\/p>\n<p>Subsequent iterations would concentrate on the company guidelines (event handling, procedural logic). That is, implementing method bodies.<\/p>\n<p>Presentation GUI would be deemed as soon as the functionality (which includes organization rules) has been authorized. This also supplies the go-ahead for test preparing.<\/p>\n<p>Every iteration would be released with minimal testing. Testing concentrate will be put into the penultimate iteration(s) that is, in the final development stage.<\/p>\n<p>Feedback is important to an iterative procedure with out such feedback, there are no additional iterations.<\/p>\n<p>Group Profile<\/p>\n<p>The focus of iterations determines the composition of the team.<\/p>\n<p>The first two iterations are the primary duty of analyst\/designers. Worthwhile contribution from programmers in this stage is not anticipated.<\/p>\n<p>Subsequent iterations are carried out successfully by programmers with minimal interference by analyst\/designers.<\/p>\n<p>Test organizing is the major duty of the business analysts.<\/p>\n<p>Presentation GUI and method testing stages in the penultimate iterations are also best accomplished by business analysts.<\/p>\n<p>Because there is a clear distinction among analysts and programmers, it would be attainable to define involvement levels of people for each iteration primarily based on the concentrate of the iteration. This would allow the team to take up new functional phases in parallel, properly ahead of a final delivery. That is, analyst\/designers could move onto a new functional phase while the programmers see the current functions by way of final iterations.<\/p>\n<p>Stage III &#8211; Penultimate Iteration(s)<\/p>\n<p>This marks the end of the user feedback stage. The functionality along with organization guidelines and presentation is now finalized. Concentrate changes to finer specifics, presentation GUI and system testing.<\/p>\n<p>Other activities incorporate:<br \/>\nTechnique Documentation<br \/>\nFinalization of class, sequence, state-transition and element diagrams<br \/>\nUser Documentation<br \/>\nDepth to the operational instructions as determined by the document format standardized<br \/>\nTop quality Assurance<br \/>\nCode walkthrough, QA testing and correction<\/p>\n<p>Stage IV &#8211; Application Packaging and Delivery<\/p>\n<p>The software program will be packaged, appropriately versioned and delivered. The &#8220;readme&#8221; file will list salient features of the functionality, any particular areas of consideration and installation directions. All user and program documentation will be component of the release. <\/p>\n<div>\n<p>\nLongxiang Industrial Restricted is providing expert precise rapid manufacturing, prototype rapid, 3d prototype, plastic prototype, 3d prototyping, 3d rapid prototyping, plastic prototyping, rapid prototype and speedy tooling in China. We look forward to participating at the achievement of your subsequent project.<\/p>\n<\/div>\n<p>Discover Far more <a href=\"http:\/\/www.rapidprototypechina.com\/prototyping\/\">Speedy Prototype Prices Articles<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>by clamshack Suggestions For Speedy Prototype Iterative Improvement Life Cycle The rapid prototype iterative prototyping method, on the other hand, will facilitate functionally scoped, however totally deployable versions of the application to be delivered to users incrementally. Functionality is enhanced by means of new iterations until the final version is reduce out. Therefore, the program [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":699,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[1],"tags":[763,432,761,762,14,21,760],"class_list":["post-698","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-prototyping","tag-cycle","tag-development","tag-iterative","tag-life","tag-prototype","tag-rapid","tag-recommendations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Recommendations For Rapid Prototype Iterative Development Life Cycle<\/title>\n<meta name=\"description\" content=\"Recommendations For Rapid Prototype Iterative Development Life Cycle posted by rapid prototyping China services company and rapid prototype Chinese manufacturer.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Recommendations For Rapid Prototype Iterative Development Life Cycle\" \/>\n<meta property=\"og:description\" content=\"Recommendations For Rapid Prototype Iterative Development Life Cycle posted by rapid prototyping China services company and rapid prototype Chinese manufacturer.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/\" \/>\n<meta property=\"og:site_name\" content=\"Rapid Prototype China\" \/>\n<meta property=\"article:published_time\" content=\"2015-12-19T23:39:31+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2015-12-19T23:40:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.rapidprototypechina.com\/blog\/wp-content\/uploads\/2015\/12\/15219992930_02a3fd7cb8_m.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"240\" \/>\n\t<meta property=\"og:image:height\" content=\"158\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Klarm Prototyping\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Klarm Prototyping\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/\"},\"author\":{\"name\":\"Klarm Prototyping\",\"@id\":\"https:\/\/www.rapidprototypechina.com\/blog\/#\/schema\/person\/794c3276e25607d71b5d77f65542608b\"},\"headline\":\"Recommendations For Rapid Prototype Iterative Development Life Cycle\",\"datePublished\":\"2015-12-19T23:39:31+00:00\",\"dateModified\":\"2015-12-19T23:40:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/\"},\"wordCount\":1202,\"image\":{\"@id\":\"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.rapidprototypechina.com\/blog\/wp-content\/uploads\/2015\/12\/15219992930_02a3fd7cb8_m.jpg\",\"keywords\":[\"Cycle\",\"Development\",\"Iterative\",\"Life\",\"Prototype\",\"Rapid\",\"Recommendations\"],\"articleSection\":[\"Prototyping\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/\",\"url\":\"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/\",\"name\":\"Recommendations For Rapid Prototype Iterative Development Life Cycle\",\"isPartOf\":{\"@id\":\"https:\/\/www.rapidprototypechina.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.rapidprototypechina.com\/blog\/wp-content\/uploads\/2015\/12\/15219992930_02a3fd7cb8_m.jpg\",\"datePublished\":\"2015-12-19T23:39:31+00:00\",\"dateModified\":\"2015-12-19T23:40:38+00:00\",\"author\":{\"@id\":\"https:\/\/www.rapidprototypechina.com\/blog\/#\/schema\/person\/794c3276e25607d71b5d77f65542608b\"},\"description\":\"Recommendations For Rapid Prototype Iterative Development Life Cycle posted by rapid prototyping China services company and rapid prototype Chinese manufacturer.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/#primaryimage\",\"url\":\"https:\/\/www.rapidprototypechina.com\/blog\/wp-content\/uploads\/2015\/12\/15219992930_02a3fd7cb8_m.jpg\",\"contentUrl\":\"https:\/\/www.rapidprototypechina.com\/blog\/wp-content\/uploads\/2015\/12\/15219992930_02a3fd7cb8_m.jpg\",\"width\":240,\"height\":158},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.rapidprototypechina.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Recommendations For Rapid Prototype Iterative Development Life Cycle\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.rapidprototypechina.com\/blog\/#website\",\"url\":\"https:\/\/www.rapidprototypechina.com\/blog\/\",\"name\":\"Rapid Prototype China\",\"description\":\"Rapid Prototyping Chinese Machine Shop\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.rapidprototypechina.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.rapidprototypechina.com\/blog\/#\/schema\/person\/794c3276e25607d71b5d77f65542608b\",\"name\":\"Klarm Prototyping\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Recommendations For Rapid Prototype Iterative Development Life Cycle","description":"Recommendations For Rapid Prototype Iterative Development Life Cycle posted by rapid prototyping China services company and rapid prototype Chinese manufacturer.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/","og_locale":"en_US","og_type":"article","og_title":"Recommendations For Rapid Prototype Iterative Development Life Cycle","og_description":"Recommendations For Rapid Prototype Iterative Development Life Cycle posted by rapid prototyping China services company and rapid prototype Chinese manufacturer.","og_url":"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/","og_site_name":"Rapid Prototype China","article_published_time":"2015-12-19T23:39:31+00:00","article_modified_time":"2015-12-19T23:40:38+00:00","og_image":[{"width":240,"height":158,"url":"https:\/\/www.rapidprototypechina.com\/blog\/wp-content\/uploads\/2015\/12\/15219992930_02a3fd7cb8_m.jpg","type":"image\/jpeg"}],"author":"Klarm Prototyping","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Klarm Prototyping","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/#article","isPartOf":{"@id":"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/"},"author":{"name":"Klarm Prototyping","@id":"https:\/\/www.rapidprototypechina.com\/blog\/#\/schema\/person\/794c3276e25607d71b5d77f65542608b"},"headline":"Recommendations For Rapid Prototype Iterative Development Life Cycle","datePublished":"2015-12-19T23:39:31+00:00","dateModified":"2015-12-19T23:40:38+00:00","mainEntityOfPage":{"@id":"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/"},"wordCount":1202,"image":{"@id":"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/#primaryimage"},"thumbnailUrl":"https:\/\/www.rapidprototypechina.com\/blog\/wp-content\/uploads\/2015\/12\/15219992930_02a3fd7cb8_m.jpg","keywords":["Cycle","Development","Iterative","Life","Prototype","Rapid","Recommendations"],"articleSection":["Prototyping"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/","url":"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/","name":"Recommendations For Rapid Prototype Iterative Development Life Cycle","isPartOf":{"@id":"https:\/\/www.rapidprototypechina.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/#primaryimage"},"image":{"@id":"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/#primaryimage"},"thumbnailUrl":"https:\/\/www.rapidprototypechina.com\/blog\/wp-content\/uploads\/2015\/12\/15219992930_02a3fd7cb8_m.jpg","datePublished":"2015-12-19T23:39:31+00:00","dateModified":"2015-12-19T23:40:38+00:00","author":{"@id":"https:\/\/www.rapidprototypechina.com\/blog\/#\/schema\/person\/794c3276e25607d71b5d77f65542608b"},"description":"Recommendations For Rapid Prototype Iterative Development Life Cycle posted by rapid prototyping China services company and rapid prototype Chinese manufacturer.","breadcrumb":{"@id":"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/#primaryimage","url":"https:\/\/www.rapidprototypechina.com\/blog\/wp-content\/uploads\/2015\/12\/15219992930_02a3fd7cb8_m.jpg","contentUrl":"https:\/\/www.rapidprototypechina.com\/blog\/wp-content\/uploads\/2015\/12\/15219992930_02a3fd7cb8_m.jpg","width":240,"height":158},{"@type":"BreadcrumbList","@id":"https:\/\/www.rapidprototypechina.com\/blog\/recommendations-for-rapid-prototype-iterative-development-life-cycle\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.rapidprototypechina.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Recommendations For Rapid Prototype Iterative Development Life Cycle"}]},{"@type":"WebSite","@id":"https:\/\/www.rapidprototypechina.com\/blog\/#website","url":"https:\/\/www.rapidprototypechina.com\/blog\/","name":"Rapid Prototype China","description":"Rapid Prototyping Chinese Machine Shop","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.rapidprototypechina.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.rapidprototypechina.com\/blog\/#\/schema\/person\/794c3276e25607d71b5d77f65542608b","name":"Klarm Prototyping"}]}},"jetpack_featured_media_url":"https:\/\/www.rapidprototypechina.com\/blog\/wp-content\/uploads\/2015\/12\/15219992930_02a3fd7cb8_m.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.rapidprototypechina.com\/blog\/wp-json\/wp\/v2\/posts\/698","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rapidprototypechina.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.rapidprototypechina.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.rapidprototypechina.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.rapidprototypechina.com\/blog\/wp-json\/wp\/v2\/comments?post=698"}],"version-history":[{"count":1,"href":"https:\/\/www.rapidprototypechina.com\/blog\/wp-json\/wp\/v2\/posts\/698\/revisions"}],"predecessor-version":[{"id":700,"href":"https:\/\/www.rapidprototypechina.com\/blog\/wp-json\/wp\/v2\/posts\/698\/revisions\/700"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.rapidprototypechina.com\/blog\/wp-json\/wp\/v2\/media\/699"}],"wp:attachment":[{"href":"https:\/\/www.rapidprototypechina.com\/blog\/wp-json\/wp\/v2\/media?parent=698"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.rapidprototypechina.com\/blog\/wp-json\/wp\/v2\/categories?post=698"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.rapidprototypechina.com\/blog\/wp-json\/wp\/v2\/tags?post=698"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}